Download Print this page

Telcoma STONE 300 GR Installation Manual page 14

Operators for swing gates 220v

Advertisement

Term. n.
20 (CON.)
21 (CON.)
M1
22 (AP)
23 (CH)
24 (Com)
25 (-)
ENC
26 (+)
1
27 (D)
40 (CON.)
41 (CON.)
M2
42 (AP)
43 (CH)
44 (Com)
45 (-)
ENC
46 (+)
2
47 (D)
28 (no)
US1
29 (nc)
30 (c)
24V
31
32 (0)
24V FT
33
34 (0)
24V
35
34 (0)
12V
36
37 (0)
38 Calza
39 Cent.
Function / Device
Output motor M1
Encoder sensor input motor M1
Output motor M2
Encoder sensor input motor M2
Contact for selectable functions
Output for auxiliary device power
supply
Output for Transmitter / Photocell
power supply
Indicator light output
Electric lock output
Receiver aerial input
V/I max
/
Motor M1 moves first in the opening direction and is
/
delayed during closing.
230/4A
An eventual electric lock should be fitted to this gate
leaf.
/
For the motor-ECU connection use a separate cable
5-12V
/
(e.g. 3x0,35) with a max. length of 10m
/
/
M2 is the second motor to move and the first one to
230/4A
close.
/
For the motor-ECU connection use a separate cable
5-12V
/
(e.g. 3x0,35) with a max. length of 10m
/
/4A
See settings for dip 7 (part. 19 fig. A)
e.g. photocells, external receivers or other 24Vac
24ac/0,5A
/
devices
Output only active during the manoeuvre and the
/
reclosing pause period, connect the photoelectric
24ac/0,5A
cell projectors so that the minimum amount of
power is used. If the jumper (part. 9 di fig. A) is set
to ON this output will be continuously active.
Status indication:
automation CLOSED – led off
/
during OPENING – flashes slowly
24ac/0,2A
during CLOSING – flashes quickly
STOP (block) – remains lit
during the RECLOSING PAUSE – double flashing
with pause
Activates, for a couple of seconds at the beginning
12dc/1,5A
/
of each opening cycle
/
Connection is only necessary if OC2 is inserted
GB
Notes
14

Advertisement

loading

This manual is also suitable for:

Stone 400 grStone 600 grT600