Buderus Logamax GB062-24 KDE H V2 Service Manual page 48

Logamax plus gb062 series; gb062-14 series; gb062-24 series; gb062-22 kd series; gb062-24 kd series; gb062-24 kde series; gb062-24 (k) series; gas wallhung boiler
Table of Contents

Advertisement

6
Inspection and maintanance
Fig. 10 Remove the burner
B Remove the top displacement body using the lifting device.
Fig. 11 Removing the top displacement body.
B Remove the bottom displacement body using the lifting
device.
48
6 720 611 626-82.1R
6 720 613 630-02.1ITL
Fig. 12 Removing the bottom displacement body.
B Clean both displacement bodies.
B Clean the heat exchanger with the brush :
– rotate in both directions
– from top to bottom to each catch
B Remove the screws from the cover of the inspection aper-
ture and and remove the cover.
Fig. 13 Cleaning the heat exchanger
B Vacuum out residues and close the inspection cover
again.
B The heat exchanger can be inspected for residue with the
aid of a torch and mirror.
6 720 613 630-01.3ITL
Logamax Plus GB062

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logamax gb062-24 kdh v2

Table of Contents