Correction By Refrigerant Piping Length; Operation Limit - Mitsubishi Electric PFD-P250VM-E Service Manual

Hide thumbs Also See for PFD-P250VM-E:
Table of Contents

Advertisement

2-4. Correction by refrigerant piping length

To obtain a decrease in cooling/heating capacity due to refrigerant piping extension, multiply by the capacity
correction factor based on the refrigerant piping equivalent length in the table below.
1
0.9
0.8
0.7
0
20
40
60
Piping equivalent length (m)
• How to obtain piping equivalent length
Equivalent length = (Actual piping length to the farthest indoor unit) + (0.50

2-5. Operation limit

• Cooling
30
25
20
15
12
10
-15
-10
-5
* The height between the Outdoor PUHY-P-YGM-A and Indoor could make the running
temperature range narrow. For details refer to P19, 7-1 Refrigerant Piping System.
• Heating
30
25
20
15
10
5
-20
-15
-10
80
100
120
140
160
0
5
10
15
20
Outdoor temperature (˚CDB)
-5
0
5
10
15
Outdoor temperature (˚CWB)
180
number of bent on the piping)m
25
30
35
40
45
20
25
30
35
40
6
45
50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pfd-p500vm-ePuhy-p250ygm-aPuhy-p500ygm-a

Table of Contents