Operation
10 Operation
Mains Voltage - Danger!
Activate the Unit only if it is secured that all necessary measures for
protection against electric shock are implemented.
10.1 Regular Operation
Enabling mains voltage during regular operation activates the Unit. Subsequently, the green
power LED H100 and the green ON LED H101 should burn. If network load optimization is
used, the LEDs H201 - H210 turn ON one after another (contingent to the selected number
of devices deployed). All measurements and functions are performed as selected.
10.2 Service Operation
If the switch S1.6 is closed, the Thyro Power Manager operates within an internal testing
mode. This is only used at the manufacturer's works. If the testing mode is active, the regular
functions are not executed any more!
10.3 End of Operation
The end of operations is achieved by de-activation of the mains voltage. Within standard
default settings, the operating time counter is then stopped, and the according value is stored
(auto save = ON). This possibly also happens for an energy measurement.
11 Maintenance
Generally, no maintenance measures are necessary for the Thyro Power Manager. Yet, one
shall observe that the level of contamination is held in limits and that the permissible ambient
temperatures are not exceeded.
AEG PSS shall annul all possible obligations, such as guarantee commitments, service
agreements etc., which may be agreed upon by AEG PSS and its distributors, without prior
notice if no maintenance is performed to the Unit, and if purchased spare parts other than
OEM AEG PSS or such other purchased by AEG PSS are used for maintenance and repair.
11.1 Repairs
Expert personnel of the company AEG may only perform repairs made to the Unit. Only OEM
spare parts are allowed to be used. Repairs performed by personnel of the user require
approval of the manufacturer.
Page 50 of 52
Operations Manual Thyro Power Manager
Version 2008-03-11