Automatic Static Network Load Optimization - AEG Thyro-Power Manager Operation Manual

Table of Contents

Advertisement

Functional Description
Figure 16: Electric Current Distribution using Thyro Power Manager
The maximum electrical current value is thus now that of a single power controller, and the
start-up time Ts is now 10 * 3 = 30 periods.
Thus, the formula may be derived to be:
×
10
Ts
×
Io
Ieff =
To
If one again assumes the electrical current of an power controller to be I
time to be Ts = 3, and the elementary period duration to be T
computed:
30
Ieff =
= 0.77
50
In a worst case, the effective value for the electrical current would be 3.18 times higher
as compared to network load optimization using the Thyro Power Manager.
7.2.1

Automatic Static Network Load Optimization

In operations mode 1, the set elementary period duration T
onto the number of power controllers (S2).
The start-up time point of each controller is shifted by 5 periods (100ms) in each single case,
as the situation displayed above for e.g. T
Thus, a more even distribution of electrical power current results.
Page 30 of 52
Operations Manual Thyro Power Manager
(Poti R309) is evenly distributed
0
= 50 periods (1s) and 10 power controllers.
0
= 1, the start-up
0
= 50, the following may be
0
Version 2008-03-11