8.2

Switch S2 - Quantity

For network load optimization, the number of connected power controllers or power controller
groups can directly be set via the help of the rotary switch S2.
The following table displays the adjustment possibilities:
Switch Position:
Table 11: Switch Position S2
S2 = Number
Figure 24: Switch S2 and S3
Page 42 of 52
Number of Power
Controllers
0
Not permitted
1
2
3
4
5
6
7
8
9
A
B
Not permitted
C
Not permitted
D
Not permitted
E
Not permitted
F
Not permitted