Commissioning

Figure 26:PC Interface Connection
9 Commissioning
9.1

Safety Notes

Mains Voltage - Danger!
Activate the Unit only if it is secured that parts under voltage cannot be
touched.
9.2

Process of Commissioning

The commissioning of the Unit is performed upon expert installation (see chapter 4
page 13 for this).
The according connections must be executed contingent to the deployed functions (see
chapter 4.5.4, page 16 for this).
9.2.1

Setting of the Operating Mode

The selected function must be set using the switch S3 (see chapter 8.3 page 43 for this). In
PC mode, the setting can also be performed by help of the PC program.
9.2.2

Setting the Number of Devices Deployed

Page 48 of 52
Operations Manual Thyro Power Manager
Version 2008-03-11