Additional Measurement Device - AEG Thyro-Power Manager Operation Manual

Table of Contents

Advertisement

Operations Manual Thyro Power Manager
Functional Description
R
max
P
> n * P
, thus it is derived that: n
Tr
Load
R
min
The facility must be designed (configuration of the voltage and the load resistances) so that
Ts
the cycle ratio
almost achieves the value 1 upon attaining the maximum load resistance
To
value R
(e.g. due to ageing at the end of the life-cycle or due to achieving operational
max
temperature).
7.3

Additional Measurement Device

The Thyro Power Manager can also be deployed as additional measurement device (ZME).
In the course, the Thyro Power Manager substitutes the ZME cards as used up to now. If
electrical currents are measured using common measurement instruments upon deployment
of full frequency package control (TAKT), a significantly fuzzy display results. This does not
occur if using the Thyro Power Manager.
The Thyro Power Manager possesses three AC measurement inputs, which are designed for
the connection of electrical current or voltage converters (see also chapter 4.5.4.3 page 19
for more). Principally, alternating voltages ranging from 0 – 1V~ may be measured using
these three inputs (see also chapter 4.5.4.8 page 24 for more). The time measurement
interval and the integration time for measurement can be adjusted (standard value = T0 = 1s,
Poti R309).
Version 2007-12-05
Page 35 of 52

Advertisement

Table of Contents
loading

Table of Contents