Switch S3 - Operating Mode; Potentiometer R309 - AEG Thyro-Power Manager Operation Manual

Table of Contents

Advertisement

Operations Manual Thyro Power Manager
8.3
Switch S3 – Operating Mode
The desired function or operating mode can directly be set via the help of the rotary
switch S3.
The following table displays the adjustment possibilities:
Switch Position:
Table 12: Switch Position S3
*1
Additionally, "S1.8 = PC mode" must be activated
8.4

Potentiometer R309

If the Thyro Power Manager is configured without a PC program and bus system (S1.8 OFF),
the elementary period duration T
setting is already set to 50 network periods (1s / 50Hz), and usually does not need to be
changed. If network load optimization is deployed, the set T
period duration of the deployed power controllers exactly. The standard default settings of
Thyro A and Thyro P are also 50 network periods (1s / 50Hz).
At the same time, the set T
function (standard setting). If another measurement integration time is desired, such can be
set via a PC program, e.g. directly to one network period (20ms / 50Hz). Other values may
be set via a change of R309.
Version 2007-12-05
0
1
Automatic static network load optimization
2
Manual static network load optimization
3
4
5
6
7
8
9
A
B
C
D
E
F
can thus be set via Poti R309. Yet, the standard default
0
is also used as measurement integration time for the ZME
0
Display and Operating Elements
Operating Mode:
Not permitted
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
*1
I/O module
Reserve
Reserve
must resemble the elementary
0
*1
Page 43 of 52

Advertisement

Table of Contents
loading

Table of Contents