Download Print this page

Setting The Switch Ip Address; Configuring The Zones And Selecting Devices; Connecting Devices - IBM System Storage SAN06B-R Quick Start Manual

Hide thumbs Also See for System Storage SAN06B-R:

Advertisement

4

Setting the switch IP address

1. Enter the required information in the
SetSwitch IP Address
2. If prompted to install Active X or a version of the Java runtime environment, do so. Reboot the setup
computer, if required.
3. Click
Next
. The
Confirm IP Address
screen is displayed.
4 Click
Next
to confirm the addresses. The
Continue Configuration
5. Click
Continue with EZManager
.
5
Setting the switch password
1. Click
Next
on the EZManager
Welcome to Switch Configuration
displayed.
2. Create a new administrator account password in the
3. Enter a new name for the switch (optional step).
4. Adjust the date and time for your time zone (optional step).
5. Click
Next
.
6

Configuring the zones and selecting devices

1. Select
Typical Zoning
on the
Select Zoning
Typical Zoning is the default zone configuration.
2. Enter the number and types of devices that you are connecting to the switch in the
screen.
EZSwitchSetup uses these values to automatically configure the ports on your switch.
7

Connecting devices

The
Configure Ports and Connect Devices
screen displays a graphical representation of the switch with the
device connections based on the information that you entered when you configured zones and performed
device selection. The screen shows the connections as missing until you connect the devices that you
specified.
screen.
screen is displayed.
screen. The
Set Parameters
Set Parameters
screen.
screen and then click
Next
.
Device Selection
1. Install the SFP transceivers in the Fibre Channel ports on the switch to match the ports shown on the
screen.
!
1a
1a
2. Make the physical connections to your host and storage devices. Match the physical connections to the
connections shown on the
screen is
!
2b
3. The
Finish
screen will display this message: "Congratulations—you've successfully completed the setup!"
4. Click
Finish
to exit setup. If you used the serial connection for setup, you can remove the serial cable.
Additional configuration options, such as custom zoning, are available from EZManager. See the
Administrator's Guide
for more information on custom zoning, and other switch configuration and management
options.
© Copyright International Business Machines Corporation 2009. All rights reserved. US Government Users Restricted Rights – Use,
duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.
© 2009 Brocade Communications Systems, Inc. All Rights Reserved.
GC27-2271-00
IBM, the IBM logo, and ibm.com are trademarks or registered trademarks of International Business Machines Corporation in the
United States, other countries, or both. A complete and current list of other IBM trademarks is available on the Web at
www.ibm.com/legal/
a. Remove any protector plugs from the SFP transceivers
you are going to use.
b. Position and insert each SFP transceiver until it is
firmly seated.
c. Close the latching bale (if any). Repeat for the other
ports.
Configure Ports and Connect Devices
screen.
a. Remove plastic protector caps from the cable ends (if any),
and position the cable connector so that it is oriented correctly.
b. Insert the cable connector into the SFP until it is firmly seated
and the latching mechanism clicks.
c. The
Configure Ports and Connect Devices
missing, valid, and invalid connections as you cable the switch.
Note that it can take up to 15 seconds for the connection to
display as a valid connection. Verify that the connections all
display green and then click
45W6292
screen shows
Next
.
EZSwitchSetup
Printed in USA

Advertisement

loading