Turbulator Installation; Reflector Installation - Roberts Gorden Vantage TF-Series Installation & Operation Manual

The twin fire unitary infrared heater
Table of Contents

Advertisement

ROBERTS GOR DON
®
T F-S
S
E RIE S

Turbulator Installation

Description
T urbulator Section 1
T urbulator Section 2
T ube

Reflector Installation

Description
Tube/Reflector Hanger
Burner T ube
Reflector
© 2004 Roberts-Gordon
S
UB MI TT AL
HEE T
Part Number
03051503
03051504
91409XXX
Part Num ber
03090100
03051XXX
02750303
APPLICATION S, ENGI NEERING AND DETAI LED GUID ANCE ON SYSTEMS DE SIGN, INSTAL LATI ON AND PRODUCT PE RFORMANCE IS AVAI LABLE UPON RE QUEST. ROBERT S GORDON
INSTALLED ONLY IN ACCORDANCE WI TH LOCAL LAWS, CODES AND REGUL AT IONS, AND ONLY BY A CONT RACT OR QUALI FIE D I N THE I NST ALL AT ION AND SE RVICE OF GAS-FIRE D HE AT ING EQUI PME NT.
Turbulator must be installed in
the last standard section of
tube.
NOTE: All tube surfaces must be covered
by a reflector, except for a U-Tube.
PRODUCT S ARE T O BE
®

Advertisement

Table of Contents
loading

Table of Contents