Preparation Before Officially Operation; Clear All Useless Data; Configure The Equipment With Working Data; Full Checking Before Implementation - Technalogix TP160 IRD User Manual

Professional hd integrated receiver decoder
Table of Contents

Advertisement

Items
Modification through WEB
Verification Result
The selected programs are displayed on the monitor after setting. It means the decoding is
working fine.

3.6. Preparation before Officially Operation

This section advises what need to be performed on the IRD before formally starts operation.
It includes but not limited to the following:
 Clear test data
 Configure the equipment with working data.
 Routing inspection.
3.6.1

Clear all useless data

To do a factory default setting on the device in order to clean up all test data generated in
the process of debugging and testing.
3.6.2

Configure the equipment with working data

According to the formal system plan to configure the IRD from signal input, descramble and
decoding output.
3.6.3

Full checking before implementation

After completion of the test and configuration, users are recommended to give the
Method
Outputs->Decoder Setup menu
(Select the programs that need decoding output, and
then choose Output->Decoder Setup->Audio menu
and Output->Decoder Setup->Video menu to set
decoding resolution, aspect ratio, output mode etc.
Outputs->Decoder Setup page
(Refer to Figure 3.4 of this manual)
37

Advertisement

Table of Contents
loading

Table of Contents