Daikin Vision CAH 003-090 C Installation And Maintenance Manual page 21

Table of Contents

Advertisement

Figure 33: Piping Arrangements
Float and
thermostatic trap
5GA or 8GA coils. Note that the
addition of a vacuum breaker to
permit the coil to drain during
shutdown.
5J, 5G, 8J or 8G coils.
5RA, 8RA, or 5SA coils. Installed
www.DaikinApplied.com
Check Valve
Strainer
High Pressure (over 25 psi)
Low Pressure (to 25 psi)
5JA or 8JA coil. Installed in series.
Note that each coil must have a
separate control valve and trap.
21
M
Control valve
modulating
Gate Valve
two position
5TA, 8TA, or 5HA coils. Conden-
sate is lifted to overhead return
main
5RA, 8RA, or 5SA coils. Banked two
high, individual trapping of each coil as
shown is preferred.
IM 672-11 • VISION AIR HANDLING UNIT
I
eChanICal
nsTallaTIon

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vision cac 003-090 c

Table of Contents