Section 2. Preparation For Use, Storage Or Shipping; General; Inspection/Check; Output Cable Requirements And Installation - Hobart Jet-Ex 5D Operation And Maintenance Manual

500285 series generator sets
Table of Contents

Advertisement

OM-2094 / Operation and Maintenance Manual
Jet-Ex 5D / Series 500285 / Generator Set

Section 2. Preparation for Use, Storage or Shipping

Preparation for Use
1.
a. General
The generator set is shipped with an empty fuel tank. After the fuel tank is filled and the generator
set is inspected, the generator set is ready for use.
CAUTION
b. Inspection/Check
Inspect the unit completely prior to operation.
(1) Remove crating, blocking, banding, ties, and other securing and protective material.
(2) Inspect exterior for shipping damage such as broken glass, damaged sheet metal, etc.
(3) Open canopy doors and inspect interior for foreign material such as rags, tools or shipping
papers.
(4) Check the fuel and coolant systems, also the oil hoses and their connections for visible leaks. If
leaks are discovered, correct by tightening hose clamps, tube fittings, etc., as required.
(5) Check security of attaching and retaining hardware.
(6) Check the following for sufficient quantity.
a. Fuel
Fuel tank capacity is 20.5 gallons (77.6 liters).
b. Engine coolant
The radiator cap is located under the hinged door, at the front of the unit, on the top canopy.
The coolant level should be approximately one inch below the filler neck to allow for sufficient
capacity for coolant expansion.
CAUTION
c. Engine lubricating oil
The oil level dipstick is located on the left side of the engine. Refer to the Engine
Manufactures User's handbook for oil recommendations.
c. Output Cable Requirements and Installation
Jet-Ex 5D units are normally supplied with a 30ft. generator-to-aircraft output cable. This output
cable consists of two single conductor 4/0 cables.
(1) Cable requirements
·
Cable length is determined by the customer's requirements. It is recommended that the
cable be no longer than 30 feet (9 m). It should be two conductor with lug-type terminals
on one end and an AN-2551 plug connector on the other.
November 1, 2000
Read operating instructions in Section 1-3 before operating the unit.
Be sure the cooling system antifreeze solution is adequate to protect below
lowest temperature expected.