Page 1
We recommend you use the Wall • TOOLS: Screwdriver Mounting Brackets provided to fix the • TWO PERSON BUILD Tower Unit to a wall (where possible). This will prevent the unit being pulled over. Use suitable fixings. Page 1 of 6 SS_INSTRUC_TU_DR_05.2016 https://www.spaceslide.co.uk/diy-installation-and-information...
Page 2
PLEASE NOTE THE 3 AND 4 DRAWER TOWER UNIT ARE THE SAME IN CONSTRUCTION. WE HAVE USED THE 3 DRAWER TOWER UNIT AS AN EXAMPLE. Note: B panel shown Lay panels (B &C) on a flat surface. Fit cams & dowels to both panels.
Page 3
PLEASE NOTE THE 3 AND 4 DRAWER TOWER UNIT ARE THE SAME IN CONSTRUCTION. WE HAVE USED THE 3 DRAWER TOWER UNIT AS AN EXAMPLE. Ensure cams are facing inwards. Page 3 of 6 SS_INSTRUC_TU_DR_05.2016 https://www.spaceslide.co.uk/diy-installation-and-information Call: 0800 9803499...
Page 4
PLEASE NOTE THE 3 AND 4 DRAWER TOWER UNIT ARE THE SAME IN CONSTRUCTION. WE HAVE USED THE 3 DRAWER TOWER UNIT AS AN EXAMPLE. MAKING THE DRAWERS (Repeat on all drawer sides). (Repeat on all drawer fronts). Drawer side...
Page 5
PLEASE NOTE THE 3 AND 4 DRAWER TOWER UNIT ARE THE SAME IN CONSTRUCTION. WE HAVE USED THE 3 DRAWER TOWER UNIT AS AN EXAMPLE. Screw soft close clip into place. (Repeat on all drawers). (Repeat on all drawers). Drawer shown from underneath. (Repeat on all drawers).
Page 6
PLEASE NOTE THE 3 AND 4 DRAWER TOWER UNIT ARE THE SAME IN CONSTRUCTION. WE HAVE USED THE 3 DRAWER TOWER UNIT AS AN EXAMPLE. USE SUITABLE WALL FIXINGS WALL MOUNTING BRACKETS We recommend you use the Wall Mounting Brackets provided to fix the Tower Unit to a wall (where possible).
Page 7
HOW TO FIT TOWER UNIT Assembly Instructions TOOLS REQUIRED: Place your tower unit into position (This can be left, centre Cutting around skirting boards (optional). Mark using a compass or right aligned). then cut using a coping saw. Please check your opening for any hidden electrical wires and water pipes before / screwing.
Page 8
225mm Fix first bracket through both holes. Mark the position of the hanger bar. By measuring in 225mm (We recommend 16mm screws). to the centre of the tower unit. 225mm Back wall Fitting the secong hanger bar. 1- Place hanger bar into first bracket and level up. 2-Make sure to mark position on the side wall 225mm from the back wall.
Need help?
Do you have a question about the Tower Unit and is the answer not in the manual?
Questions and answers