Table Of Contents - Daikin A2 F 18H Installation And Operating Instructions Manual

Oil condensing boiler
Table of Contents

Advertisement

List of contents
List of contents
1.1
Particular safety instructions .....................................................
1.1.1
Observing the instructions ..........................................
1.1.2
Meaning of warnings and symbols..............................
1.2
1.2.1
General .......................................................................
1.2.2
Intended use ...............................................................
1.2.3
Device installation room..............................................
1.2.4
Electrical installation ...................................................
1.2.5
Requirements for the heating water............................
1.2.6
1.2.7
Fuel .............................................................................
1.2.8
Operation ....................................................................
2.1
Instruct the owner......................................................................
2.2
Warranty conditions...................................................................
3.1
Design and components............................................................
3.2
Brief description......................................................................... 10
4.1
Dimensions and connection dimensions ................................... 11
4.2
Different set-ups ........................................................................ 11
4.2.1
Room-air independent operation ................................ 12
4.2.2
Partial ambient air-independent mode ........................ 12
4.2.3
Ambient air-dependent mode...................................... 13
4.2.4
with CEN/TR 1749 ...................................................... 13
4.3
Transport and delivery............................................................... 14
4.4
Installing the oil condensing boiler ............................................ 15
4.4.1
Selecting the installation site....................................... 15
4.4.2
Installing the device .................................................... 16
4.5
Air/flue gas system (LAS).......................................................... 16
4.5.1
4.5.2
Connecting a flue gas line........................................... 17
4.5.3
Flue gas system kits ................................................... 18
4.6
Water connection ...................................................................... 19
4.6.1
Connecting hydraulic lines .......................................... 19
4.6.2
Connect the condensate drain .................................... 20
4.7
Electrical connection ................................................................. 20
4.7.1
electrical connections.................................................. 20
4.7.2
4.7.3
components ................................................................ 22
4.7.4
sensor ......................................................................... 23
4.7.5
RoCon M1 mixer module (optional) ............................ 24
4.7.6
Room controller RoCon U1 (optional)......................... 24
4.7.7
Internet Gateway RoCon G1 (optional)....................... 24
4.7.8
Room thermostat (optional) ........................................ 24
4.7.9
External switching contact (optional) .......................... 24
4.8
Connect the oil line.................................................................... 25
4.8.1
4.8.2
Connecting the oil filter ............................................... 25
4.8.3
Connect the oil line ..................................................... 26
4.9
Filling the system....................................................................... 26
4.9.1
pressure gauge ........................................................... 26
4.9.2
Filling the heating system ........................................... 26
4.10
Installing/Removing the boiler cladding..................................... 26
5.1
Initial commissioning ................................................................. 29
5.1.1
Requirements.............................................................. 29
2
5.1.2
Checks before start-up................................................. 29
5.1.3
Start-up ........................................................................ 29
5.1.4
After start-up ................................................................ 29
5.2
Checklists for start-up................................................................. 30
4
4
6.1
5
6.2
Replacing the RoCon B1 control panel ...................................... 31
5
6.3
Change cables ........................................................................... 32
5
6.4
Changing sensors ...................................................................... 32
5
6.4.1
5
6.4.2
6
6
6.5
Replacing the fuse or circuit board............................................. 33
6
6
7.1
Design and brief description....................................................... 35
6
7.2
Safety function............................................................................ 36
6
7.3
Burner setting ............................................................................. 36
7
7.3.1
Setting values .............................................................. 36
7.3.2
Establishing access to the burner ................................ 37
7
7
7.3.3
Checking and setting the burner .................................. 37
7.3.4
Check the vacuum at the oil pump............................... 37
8
7.3.5
Adjusting the flue gas quality ....................................... 37
8
7.3.6
Recirculation gap ......................................................... 38
7.3.7
11
7.4
Dismantling the burner ............................................................... 39
7.4.1
Move the burner to the service position ....................... 39
7.4.2
7.4.3
Removing/fitting the burner.......................................... 40
7.5
Connecting the firing unit............................................................ 41
7.6
Ignition transformer with flame monitor ...................................... 41
7.7
Oil burner pump and oil filter ...................................................... 42
8.1
Hydraulic system connection...................................................... 43
9.1
General overview of service and maintenance .......................... 45
9.2
Service and maintenance tasks ................................................. 45
9.2.1
Filling, topping up the heating system.......................... 45
9.2.2
Checking the connections and pipes ........................... 46
9.2.3
siphon/condensate box ................................................ 46
9.2.4
Checking and cleaning the burner ............................... 48
9.2.5
10.1
Troubleshooting.......................................................................... 50
10.2
Overview of possible malfunctions ............................................. 50
10.3
Fault codes................................................................................. 52
10.4
10.5
Emergency operation ................................................................. 53
11.1
Temporary shutdown.................................................................. 54
11.2
Final decommissioning and disposal.......................................... 54
12.1
Basic data................................................................................... 55
12.1.1
12.1.2
Information on the type plate ....................................... 57
12.1.3
regulation (EU) 811/2013............................................. 57
12.1.4
Tightening torque ......................................................... 58
12.2
Flow rate and residual feed height ............................................. 59
12.3
Temperature sensor ................................................................... 59
12.4
Electrical connection diagram .................................................... 60
29
31
35
43
45
50
54
55
62
63
008.1546499_02 - 04/2018 - EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

A2 f 24hD9ha2032aA2 f 32hD9ha2018aD9ha2024a

Table of Contents