Download Print this page

Dynojet Power Commander V Installation Manual page 4

2014-2015 ducati m1200

Advertisement

FIG.D
FIG.E
FIG.F
Ground
14-026
www.powercommander.com
7
Unplug the stock Crank Position Sensor (Fig. D).
This is a BLACK, 3 pin connector on the right side of the engine near the coolart
overflow reservoir.
8
Plug the PCV in-line of the stock CPS and wiring harness.
9
Attach the ground wire of the PCV to the case bolt on the left side of the
engine (Fig. F).
10 Reinstall fuel tank and seat.
NOTE: If you want to adjust the closed loop area you will either need the optional
O2 Optimizer or have your ECU reflashed.
14-15 Ducati M1200 - PCV F/I - 4

Advertisement

loading
Need help?

Need help?

Do you have a question about the Power Commander V and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel