FIG.A
FIG.B
FIG.C
14-026
www.powercommander.com
1
Remove the seat and lift the fuel tank up.
2
Lay the PCV in the tail section and route down the left side of the frame and go
towards the air box.
3
Unplug the 6 pin connector on the left shown in Figure A.
4
Unplug the 3 pin connector on the right shown in Figure A.
5
Plug the PCV in-line of the stock wiring (Fig. C).
6
Route the remaining connectors from the PCV down the right side of the
engine.