Connection procedure

Open the door of the incoming (load switch-disconnector or air circuit breaker) cubicle.
Remove any shrouds covering the input terminals and cable entries.
Lead the cables into the cubicle. Make the 360° earthing arrangement at the cable entries as shown below.
Cut the cables to suitable length.
Strip the cables and conductors.
Twist the cable screens into bundles and connect to cabinet PE (ground) busbar.
Connect the separate ground conductors/cables to cabinet PE (ground) busbar.
Connect the phase conductors to the input terminals using the torques given in chapter
section
Input power
Refit the shrouds removed earlier.
Close the door.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
Grommet (in IP54
units only)
connection.
79
Technical
data,
Electrical installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents