Chapter 3: Planning The Installation; Installation Checklist; Parts Supplied; Schematic Diagram - Raymarine RMK-10 Installation Instructions Manual

Hide thumbs Also See for RMK-10:
Table of Contents

Advertisement

Chapter 3: Planning the installation

3.1 Installation checklist

Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.

Schematic diagram

A schematic diagram is an essential part of planning
any installation. It is also useful for any future
additions or maintenance of the system. The
diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
12

3.2 Parts supplied

The parts supplied with the keypad are shown below.
1. RMK-10 keypad
2. Landscape keypad mat
Note: The Landscape keypad mat is only
supplied with T70293
3. Portrait keypad mat (supplied fitted to the unit)
4. Mounting gasket
5. 4 x mounting fixings
6. Documentation pack
7. Right angled power cable 2 m (6.6 ft.)
8. RayNet network cable 2 m (6.6 ft.)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents