Ce Declaration - Janfire Integral 25 Installation Manual

Pellet boiler
Table of Contents

Advertisement

DANGER
Risk of burns
Note The free space around the Janfire pellet boiler should be in accordance with local regulations
(council planning department).
The boiler room should meet the requirements of the fire authorities. Contact a qualified local chimney
sweeping contractor.
The burner is equipped with a safety cut-out that prevents operation of the burner with the burner
desmounted. The boiler door is locked with a sturdy nut and cannot be open without tools. Always
disassamble the burner before the boiler door opening to prevent the burner to start involintary on the outside
boiler.
The temperature limited, valve and safety valve 9 bar should always be installed.
1.4

CE declaration

If the unit is used in combinations other than those tested, then Janfire AB can not guarantee conformity with
the EU directive.
IA 32580002 EN_Ver5
Installation Instructions Janfire Pellet Boiler Integral Typ 25
© Janfire 2014
)
5(25

Advertisement

Table of Contents
loading

Related Products for Janfire Integral 25

Table of Contents