Commissioning Report - Janfire Integral 25 Installation Manual

Pellet boiler
Table of Contents

Advertisement

7.0

Commissioning Report

Customer details
Name:
Address:
Postcode:
Telephone:
Janfire Pellet boiler
Date of Installation:
Maximum thermal output
Estimated Annual Energy Yield
Percentage to be met by boiler
Fuel Displaced (if more than one,
state the main one only)
Pellets boiler check list
Operators manual is present, including warranty
& chimney certificate
Cleaning tools are available
Pellet conforms to CENT, DIN Plus or ONORM
Flue building consent has been granted
Single flue in use (diameter ) Number of
Bends? ( )
Sufficient access / clearance for cleaning
Electric connection to switched spur
IA 32580002 EN_Ver5
Installation Instructions Janfire Pellet Boiler Integral Typ 25
Natural Gas
Oil
Coal
Electricity
( Y/N )
© Janfire 2014
Service Technican
Integral Typ 25
Date of site visit:
Operator / User Training ( Y/N )
Customer has received explanation of
stove / boiler functions / characteristics
Adjustment possibilities with respect to
controls / operating instructions
Cleaning / Servicing procedures have been
discussed with user
A maintenance contract has been agreed
Ignition starts correctly during start phase
Observe combustion during all heating
output levels, manual & automatic
Combustion air calibrated on emission test
with extern gas analyser.
kW
kWh/annum
%
Note:
)
22(25

Advertisement

Table of Contents
loading

Related Products for Janfire Integral 25

Table of Contents