Figure 3-6 Drain Flow Diagram - Parr Instrument 6400 Operating Instructions Manual

Automatic isoperibol calorimeter
Table of Contents

Advertisement

6400
3
Operation
Drain
At the completion of the bomb rinse sequence, the drain sequence begins.
Figure 3-6
Drain Flow Diagram
The water in the bucket is drained out of the bucket and routed to the drain connection. Once the bucket is
drained, the calorimeter may be opened to remove the bomb head and load the next sample.
27
w w w . p a r r i n s t . c o m

Advertisement

Table of Contents
loading

Related Products for Parr Instrument 6400

Table of Contents