Pre-Period; Pre-Period/Post-Period Flow Diagram - Parr Instrument 6400 Operating Instructions Manual

Automatic isoperibol calorimeter
Table of Contents

Advertisement

3
Operation

Pre-Period

At the completion of the fill sequence, the pre-period begins.
1. The water fill solenoid valve closes and isolates the water in the bucket from the rest of the system.
Water within this bucket is circulated by the stirrer. Water continues to circulate from the closed water
system through the jacket surrounding the bucket.
2. The oxygen filling valve closes and the pressure in the filling line is vented. The automatic check valve at
the top of the bomb closes and isolates the bomb from the oxygen filling line.
3. The controller monitors the operating temperature until it confirms that the initial equilibrium has been
established.
24
P a r r I n s t r u m e n t C o m p a n y
Figure 3-4

Pre-Period/Post-Period Flow Diagram

Advertisement

Table of Contents
loading

Related Products for Parr Instrument 6400

Table of Contents