Download Print this page

Arrow Storage Products DS108EU Owner's Manual & Assembly Manual page 39

10’ x 8’

Advertisement

Step 17: Continued
You will need for this page:
JB
(QTY: 8)
Continue to apply weather stripping.
4
Attach Long Ridge Cap with four (4) Java Bolts
and Nuts. DO NOT secure end of Ridge Caps
until Peak Caps are in place.
DO NOT fully tighten Ridge Cap bolts until you
have both Ridge Cap bolts in place. This will
ease assembly. Bolts must be fully tightened
before moving on to the next page.
1
10712
Ridge Cap
4
39
• Bolts thru Ridge Cap pass thru slots where
the Roof Panels overlap with the Panels next to
them (labeled ribs #2 and #5 below).
4
5
Weather Stripping Tape should be applied
in a continuous strip along the length of
the roof.
DO NOT secure end of Ridge Caps
until Peak Caps are in place.
39W
1
2
3

Advertisement

loading

This manual is also suitable for:

Ds108spDs108h6Ds108Sbds108