Download Print this page

Arrow Storage Products DS108EU Owner's Manual & Assembly Manual

10’ x 8’

Advertisement

Quick Links

722400817
Owner's Manual
& Assembly Guide
Gloves must be worn
at all times to reduce
risk of injury!
Customer Service:
1-800-851-1085
assist@arrowsheds.com
BUILDING DIMENSIONS
Approx.
Size
10' x 8'
77 Sq. Ft. 520 Cu. Ft.
3,0 m x 2,4 m
7,2 m
* See Inside for Detailed Safety Information.
or
Size rounded off to the nearest foot
Exterior Dimensions
Storage
(Roof Edge to Roof Edge)
Area
Width
123 1/4"
2
14,7 m 3
313,1 cm
Model No.
DS108EU
DS108SP A
Depth
Height
Width
99 1/2"
90 3/4"
118 1/4"
252,7 cm
230,5 cm
300,4 cm
www.arrowsheds.com
DS108H6 A
SBDS108 A
10' x 8'
Base
Size
307,3 cm x 246,4 cm
For proper base construction see page 12
Interior Dimensions
(Wall to Wall)
Depth
Height
94 1/4"
89 1/4"
239,4 cm
226,7 cm
01BV
DS108
Nominal Size
121" x 97"
Door
Opening
Width
Height
59 1/2"
69 1/4"
151,1 cm
175,9 cm

Advertisement

loading

Summary of Contents for Arrow Storage Products DS108EU

  • Page 1 01BV 722400817 Owner’s Manual & Assembly Guide www.arrowsheds.com Model No. DS108 Gloves must be worn DS108EU DS108H6 A at all times to reduce risk of injury! DS108SP A SBDS108 A 10’ x 8’ Nominal Size Customer Service: 1-800-851-1085 Base 121” x 97”...
  • Page 2 SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! Practice caution with the tools being used in the Care must be taken when handling various pieces assembly of this building. Be especially familiar with of your building since many contain sharp edges.
  • Page 3 ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building.
  • Page 4 FREQUENTLY ASKED QUESTIONS How long will it take to assemble the building? Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly.
  • Page 5 What kind of base do I use? You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/fl oor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/fl oor, an Arrow fl...
  • Page 6 What if the rear wall angle and channels are too large to fi t inside of the rear wall panels? Check the dimensions of wall assemblies. They should be slightly smaller than the fl oor frames. Lay the assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward.
  • Page 7 HARDWARE LIST... Part Hardware Views by Key No. Part Qty. Description List 65103 Hex Nut (#8-32) 65923-33 Small Bolt (Sand) (#8-32 x 3/8) (10 mm) #2 Phillips #2 Phillips 11/32 Hex. 65923-18 Small Bolt (Java) (#8-32 x 3/8) (10 mm) 65004-33 Small Screw (Sand) (#8AB x 5/16) (8 mm) 65004-18 Small Screw (Java) (#8AB x 5/16) (8 mm) 66783...
  • Page 8: Table Of Contents

    PARTS LIST... Part Part Qty. Selected End Views by Key No. Description List 6635 Roof Beam Bracket 9009 Gable Brace 9204 Roof Beam Brace 5210 Wall Panel 6521 Wall Panel 7571 Roof Panel 7743 Roof Panel 8576 Right Gable 8577 Left Gable 10 10699 Front Wall Panel 11 10700 Right Roof Panel...
  • Page 9 ASSEMBLY BY KEY NO. Walls Floor...
  • Page 10 ASSEMBLY BY KEY NO. Roof Doors...
  • Page 11 ASSEMBLY OVERVIEW Install Corner Panels, Side Angles, Build the Floor Frame Rear Angles, and Front Header Attach Gables and Roof Beams Install Wall Panels, Wall Channels, and Door Jambs Install Roof Panel, Ridge Cap, Side Install Doors Trim, and Corner Cap Shed is now complete.
  • Page 12 CONSTRUCTING A BASE... No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 13 Step 1: Floor Frames You will need for this page: 10704 Washers are to be used on painted parts only. Washers are not necessary on unpainted Side Floor parts and there are not enough to use on (QTY: 8) Frame every screw and bolt.
  • Page 14 Step 1: Continued You will need for this page: 10703 Front/Rear (QTY: 8) Floor Frame Overlap two (2) Front/Rear Floor Frames as 10703 shown and secure with four (4) Bolts and Nuts. Two (2) Sand Bolts and Nuts must enter from bottom.
  • Page 15 Step 2: Wall Frames You will need for this page: 5986 9917 Rear Channel Rear Angle (QTY: 2) 5986 9917 Overlap two (2) Rear Wall Angles so that fi ve (5) holes align as shown. Insert one (1) Sand Bolt and Nut through the center hole.
  • Page 16 Step 2: Continued You will need for this page: 10715 10706 10706 Side Channel Side Angle (QTY: 4) Overlap two (2) Side Wall Angles so that three (3) holes align as shown. Insert one (1) Sand Bolt and Nut through the center hole. Set aside for use in Step 10. 10715 10706 Overlap parts so three...
  • Page 17 Step 3: Header You will need for this page: 10707 10708 Front Inner Front Outer (QTY:2) Header Header Connect the Front Inner Header to a Front Outer 10708 Header using one (1) Sand Screw as shown. Repeat this for the opposite end. Set aside for use in Step 10.
  • Page 18 Step 4: Roof Beams You will need for this page: 10713 10713 BUILD TWO (2) BEAMS Roof Beam (QTY: 16) Overlap two (2) Roof Beams so that the bottom slots align as shown. Insert six (6) Sand Bolts and Nuts as shown below. Overlap parts so the bottom slots align.
  • Page 19 Step 4: Continued You will need for this page: BUILD ONE (1) DOUBLE (MAIN) BEAM 10713 10713 Roof Beam (QTY: 14) 10713 Overlap two (2) Roof Beams so that bottom slots align but DO NOT INSERT BOLTS. Next, overlap two (2) more Roof Beams to form a second Roof Beam Assembly.
  • Page 20 Step 5: Door Pre-Assembly You will need for this page: 10782 10718 10719 10720 67236 Horizontal Door Handle Diagonal Door Adhesive Pad Door Panel (QTY: 2) Door Brace Brace Brace (QTY: 24) Start assembly by sliding the Door Handle Place the ends of Diagonal Door Braces Brace into the middle of the Door and securing with small holes under Horizontal Door it with four (4) Sand Screws.
  • Page 21 Step 6: Right Door Assembly You will need for this page: 66609 66809 66054 66811 Handle Locking (QTY: 2) (QTY: 6) (QTY: 6) Hinge Handle Right Latch Backplate 66812 Hinge Plate Decor Attach Hinges to Door using six (6) Flat Head Bolts. Install Locking Handle and Handle Backplate...
  • Page 22 Step 7: Left Door Assembly You will need for this page: 66609 66810 66811 66812 Handle Hinge Plate Left (QTY: 2) (QTY: 6) Hinge Backplate Decor Handle (QTY: 6) Attach Hinges to Door using six (6) Flat Head Bolts. Locking Handle Install Handle Backplate using two (2)
  • Page 23 Step 7: Continued You will need for this page: 66808 10721 66684 Bottom Top Latch Door Stop (QTY: 8) Latch Spring Spring Remove two (2) Screws from left side of Door Handle Brace and far left Screw from both top and bottom Horizontal Door Brace.
  • Page 24 Step 8: Floor Assembly You will need for this page: Assemblies from Step 1: • Front/Rear Floor Frame Assemblies (2) • Side Floor Frame Assemblies (2) (QTY: 8) Do NOT fasten your Floor Frames to your Base at this time. You will anchor your building after it is erected.
  • Page 25 Step 9: Corner Panels Be cautious when maneuvering You will need for this page: and placing Panels. Once Panels 10701 begin to go up it is important to be able to fi nish in a timely manner to reduce the possibility of wind Corner (QTY: 8) Panel...
  • Page 26 Step 10: Wall Framing You will need for this page: Assemblies from Step 2 and Step 3: • Rear Wall Angle Assembly (1) • Side Wall Angle Assemblies (2) • Header Assembly (1) (QTY: 8) • Use two (2) Java Screws to do each of the following: •...
  • Page 27 Step 11: Wall Panels FASTEN TO WALL ANGLES You will need for this page: 5210 6521 10699 [ NO HARDWARE NEEDED FOR THIS STEP ] FrontWall Wall Panel Wall Panel Panel Lay out all Panels in the positions shown below. FASTEN TO WALL CHANNELS (STEP 13) Double check that you have the correct Panel in each location.
  • Page 28 Step 11: Continued You will need for this page: Working one side at a time, lift the Panels into place and secure top and bottom of Panels with Screws. Be sure to use Java Screws on Corner Panels and Sand Screws on Wall Panels.
  • Page 29 Step 12: Door Jambs You will need for this page: 80057 10716 Right Door Left Door (QTY: 8) (QTY: 4) Jamb Jamb Secure Door Jambs with two (2) Java Screws in the top and bottom of each Door Jamb as shown. Secure Door Jamb to Panel using two (2) Java Bolts and Nuts as shown below.
  • Page 30 Step 13: Wall Channels You will need for this page: 10709 Assemblies from Step 2: • Rear Wall Channel Assembly (1) • Side Wall Channel Assemblies (2) Front Chan. (QTY: 12) (QTY: 2) (QTY: 44) Rear Wall Channel Assembly Install Rear Wall Channel Assembly by placing Screws through all remaining holes in Wall Panels.
  • Page 31 Step 14: Gables You will need for this page: 8577 8576 6635 69835 (QTY: 8) Left Gable Right Gable Bracket Edge Trim GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MIS- TAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. Edge Trim (Plastic) Edge Trim MUST cover Gable edge.
  • Page 32: Gable Brace

    Step 14: Continued You will need for this page: 9009 (QTY: 14) (QTY: 3) Gable Brace Gable must fi t UNDER Side Wall Angle at corner. Working with one (1) Gable at a time, attach the Rear Gables to the Rear Use bolts where Wall Angle with fourteen (14) Sand Angles overlap.
  • Page 33 Step 14: Continued You will need for this page: 9009 6228 (QTY: 18) (QTY: 2) Gable Brace Track Sup. Leave two (2) holes open on each side of the Gable peak to attach Track Support. Working with one Gable at a time, attach the front Gables to the Header with Sand Screws.
  • Page 34 Step 15: Roof Framing You will need for this page: 67545 Assemblies from Step 4: • Double (Main) Roof Beam Assembly (1) • Single Roof Beam Assemblies (2) Weather (QTY: 12) Stripping Tape should wrap around gap between Gables. Top View of Gables Seal the gap between the Gables using the Weather Stripping Tape as shown.
  • Page 35: Roof Beam Brace

    Step 15: Continued You will need for this page: 9204 Beam Brace (QTY: 4) Attach the Roof Beam Brace to the Gable with one (1) Sand Bolt and Nut as shown and rotate to align with Roof Beam. Secure to Roof Beam with one (1) Sand Bolt and Nut as shown.
  • Page 36: Roof Panel

    Roof Install Prep Page Use the information on this page to complete steps 16 thru 17. If Roof Beam holes do not line up with Roof Panel holes, shift the building from left to right. If this does not help, your building may not be level. Shim the corners until holes line up.
  • Page 37 Step 16: Roof Corners You will need for this page: 10700 80053 Right End Left End (QTY: 8) (QTY: 24) Secure the fi rst End Panel in rear of unit to the Main Roof Beam by placing a Java Screw in hole #1 (from the diagram below). Carefully remove the Gable Edge Trim once the Panel is in position.
  • Page 38: Ridge Cap

    Step 17: Roof Assembly You will need for this page: 7571 7743 67545 Weather Roof Panel Roof Panel (QTY: 32) (QTY: 4) Stripping FASTEN TO RIDGE CAP (NEXT TWO PAGES) Begin Weather Stripping the roof ridge. Apply more of the weather stripping after each additional Panel is installed.
  • Page 39 Step 17: Continued You will need for this page: 10712 Ridge Cap (QTY: 8) • Bolts thru Ridge Cap pass thru slots where Continue to apply weather stripping. the Roof Panels overlap with the Panels next to them (labeled ribs #2 and #5 below). Attach Long Ridge Cap with four (4) Java Bolts and Nuts.
  • Page 40 Step 17: Continued You will need for this page: 10711 7571 (QTY: 44) Roof Panel Ridge Cap (QTY: 4) Continue to apply weather stripping. Install Roof Panels #9 and #10. Finish Weather Stripping the roof and cut the tape just past the end of the roof. Fold end of tape under roof edge.
  • Page 41 Step 18: Roof Trim You will need for this page: 80055 10710 (QTY: 4) (QTY: 8) (QTY: 4) Left Trim Right Trim Trim Cap (L) Trim Cap (R) Slide Peak Cap legs under Ridge Cap and secure Peak Cap with two (2) Java Bolts and Nuts on each end. Position Roof Trim as shown below and secure with Java Screws.
  • Page 42: Door

    Step 19: Door Installment You will need for this page: Assemblies from step 5: 10702 • Right Door Assembly (1) • Left Door Assembly (1) (QTY:4) (QTY:12) Ramp NEED AT LEAST TWO PEOPLE TO PERFORM THIS STEP! Using three (3) Flat Head Bolts and Nuts per Door Hinge, secure Doors to Door Jambs.
  • Page 43 ANCHORING OPTIONS... IMPORTANT: • If you have swing doors, they must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • If you have purchased a Floor Frame Kit, you should install it at this time. •...
  • Page 44 CARE & MAINTENANCE... Exterior Care: For a long lasting fi nish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region.
  • Page 45 ARROW ACCESSORIES... ANCHOR KITS FLOOR FRAME KITS Model No. AK4 MODELS FB47410, FB5465, Anchor Kit contains heavy-duty steel FB106-A, FB109-A, FB1014-A, augers, 60' (18 m) of steel cable and and FBSDS108 4 cable clamps. No digging or concrete pouring, just insert cable under roof, A simple fl...
  • Page 46 ASSEMBLY NOTES...
  • Page 47 ASSEMBLY NOTES...

This manual is also suitable for:

Ds108spDs108h6Ds108Sbds108