Download Print this page

Arrow Storage Products DS108EU Owner's Manual & Assembly Manual page 19

10’ x 8’

Advertisement

Step 4: Continued
You will need for this page:
SB
(QTY: 14)
Overlap two (2) Roof Beams so that bottom slots align
5
but DO NOT INSERT BOLTS. Next, overlap two (2) more
Roof Beams to form a second Roof Beam Assembly.
DO NOT INSERT BOLTS .
6
Place both Roof Beam Assemblies back-to-back to
form a Double (Main) Beam. Insert ten (10) Sand Bolts
and Nuts as shown below.
Six (6) holes align.
Two (2) holes align.
7
Insert four (4) Sand Bolts and Nuts into slots from
bottom. Set aside for use in Step 15.
8
Check that the fi nished length of the
assembly is 96 1/8" (244,2 cm).
CHECK THAT ALL ASSEMBLED PARTS ARE
THE CORRECT LENGTH BEFORE CONTINUING
4
10713
Roof Beam
19
BUILD ONE (1) DOUBLE (MAIN) BEAM
10713
10713
End View of Double Beam
Side of Beams with small
Place two (2) bolts thru slots
on each side of the Beam.
Overlap Length
6" (15,2 cm)
96 1/8" (244,2 cm)
10713
10713
holes must face up.
Finished Length
19W

Advertisement

loading

This manual is also suitable for:

Ds108spDs108h6Ds108Sbds108