Figure 6-31: Secogear Primary Indoor Anchoring Method; Figure 6-32: Secogear Alternate Indoor Anchoring Method; Figure 6-33: Installation Top View - GE SecoGear Application Manual

5kv - 15kv ieee metal-clad switchgear
Hide thumbs Also See for SecoGear:
Table of Contents

Advertisement

DET-882
2Ø 18.0 mm [0.709 in] Holes
for M12 [0.5 in] Anchor
Bolts, Front & Rear
Embedded Channel
C5 x 6.7# min.
2Ø 18.0 mm [0.709 in] Holes
for M12 [0.5 in] Anchor
Bolts, Front & Rear
Embedded Channel
C5 x 6.7# min.
©2017 General Electric All Rights Reserved
SecoGear Medium-voltage Switchgear Application and Technical Guide

Figure 6-31: SecoGear Primary Indoor Anchoring Method

Clearance Space

Figure 6-32: SecoGear Alternate Indoor Anchoring Method

Figure 6-33: Installation Top View

2290.06 mm [90.16 in]
Standard SecoGear Construction, Features, and Installation
35.05 mm [1.38 in]
35.05 mm [1.38 in]
25.4 mm [1.0 in] max.
Conduit Leads
25.4 mm [1.0 in] max.
Conduit Leads
35.05 mm [1.38 in]
203.2 mm
[8.0 in]
65