Download Print this page
Hide thumbs Also See for AXCOR BEAM 300:

Advertisement

INDEX
Page
Contents
2
3
4
5
7
12
12
AXCOR BEAM 3
INSTRUCTION MANUAL
Congratulations on choosing a Claypaky product!
We thank you for your custom.
Please note that this product, as all the others in the rich
Claypaky range, has been designed and made with total
quality to ensure excellent performance and best meet your
expectations and requirements.
1
C61730

Advertisement

loading
Need help?

Need help?

Do you have a question about the AXCOR BEAM 300 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Claypaky AXCOR BEAM 300

  • Page 1: Table Of Contents

    Please note that this product, as all the others in the rich Page Contents Safety Information Claypaky range, has been designed and made with total quality to ensure excellent performance and best meet your Unpacking and preparation expectations and requirements.
  • Page 2: Safety Information

    SAFETY INFORMATION IMPORTANT: Claypaky recommends you carefully read and keep the safety information on this product, also SAFETY INFORMATION available in digital format at the following link: Ref: [FIS01A – Safety Information Axcor 300 series] http://www.claypaky.it/en IMPORTANTE: Claypaky raccomanda di leggere accuratamente e conservare le informazioni di sicurezza relative...
  • Page 3: Unpacking And Preparation

    UNPACKING AND PREPARATION Packing contents - Fig. 1 LOCKED UNLOCKED PAN Mechanism Lock and Release (every 90°) - Fig. 2 TILT Mechanism Lock and Release (every 45°) - Fig. 3 AXCOR BEAM 3...
  • Page 4: Installation And Start-Up

    INSTALLATION AND START-UP Installing the projector - Fig. 4 The projector can be installed on the floor resting on special rubber feet, on a truss or on the ceiling or wall. WARNING: with the exception of when the projector is positioned on the floor, the safety cable must be fitted. (Cod. 105041/003 available on request). This must be securely fixed to the support structure of the projector and then connected to the fixing point at the centre of the base.
  • Page 5: Control Panel

    CONTROL PANEL Mains NB: connecting one Axcor Beam 300 to the mains, it is possible to connect up to a maximum 11 @ 200-240Vac or 5 @ 100-120Vac Axcor Beam 300 in parallel at the same time. Connecting to the mains supply - Fig. 6...
  • Page 6 Reversal of the display - Fig. 9 To activate this function, press UP and DOWN keys simultaneously while the display is in the rest mode. This status will be memorised and maintained even for the next time it will be switched on. To return to the initial state, repeat the operation all over again. On each projector, the starting address must be set for the control signal (addresses from 1 to 512).
  • Page 7: Maintenance

    MAINTENANCE 1/4 Turn 1/4 Turn Locking and releasing Pan and Tilt movements - Refer to the instructions in the UNPACKING AND PREPARATION section. Opening the head covers - Fig. 10. Closing the head covers - Fig. 11. Continue AXCOR BEAM 3...
  • Page 8 • General cleaning of internal parts. • Restoring lubrication of all parts subject to friction, using lubricants specifically supplied by Claypaky. • General visual check of the internal components, cabling, mechanical parts, etc.
  • Page 9 Cleaning of the filters - Fig. 13 Upper Side Extraction of the effect modules - Fig. 14 Insertion of the effect modules: Repeat the operations indicated in Fig. 14 in reverse order. IMPORTANT: Grasp the modules using the support structure and not the details which could get damaged. Continue AXCOR BEAM 3...
  • Page 10 Fuse 5x20mm - 3.15AT 250V Replacing fuse - Fig. 15 AXCOR BEAM 3...
  • Page 11 Battery removal - Fig. 16 This product contains a rechargeable battery. To preserve the environment, please dispose the battery at the end of its life according to the regulation in force. AXCOR BEAM 3...
  • Page 12: Technical Information

    Fault in the electronic circuits. Call an authorised technician. Lenses broken Call an authorised technician. Dust or grease deposited. Clean (see instructions). - Via Pastrengo, 3/b - 24068 Seriate (BG) Italy - Tel. +39-035-654311 - Fax +39-035-301876 - www.claypaky.it Clay Paky S.p.A.

This manual is also suitable for:

C61730