Download Print this page

Cbyrxx32 + Cbypxxhb32 - Peninsula Table With High Base (Hb) Pedestal 32"D - Global CBYCTxxxxHxx Installation Manual

Corby collection: occasional table,peninsula table,freestanding work table,modesty panel,peninsula table with low base (lb) pedestal 32 inch d,peninsula table with high base (hb) pedestal 32 inch d,stack-on bookcase with credenza

Advertisement

CORBY INSTALLATION GUIDE
CBYR
32 & CBYP
HB32 - PENINSULA TABLE WITH HIGH BASE (HB) PEDESTAL 32"D
xx
xx
NOTE: Open and assemble only one product at
a time to avoid a potential mix-up of parts and
hardware. It is advisable to assemble the unit on
a clean padded surface to avoid scratches.
CAUTION: Do not drag the assembled furniture
across the floor. Lift the unit completely off the
floor, and move it to the desired location.
ASSEMBLY
STEP 1: Remove the drawer from the pedestal, if any.
STEP 3: Type of configuration
FLUSH CONFIGURATION
STEP 4: Place the peninsula table on the pedestal to align the two (2) drilled holes in the pedestal with the two (2) inserts installed in the bottom of the worksur-
face. Install two (2) Phillips PH screws (1/4-20 x 1
FLUSH CONFIGURATION
STEP 5: Slide the drawers back into the pedestal, if any. The units are now assembled.
FLUSH CONFIGURATION
5
Required tools
Safety glasses
Bit #6 Phillips
Included hardware
Phillips PH screw
Washer plate
1/4-20 x 1
, Qty. 2
Ø 1/4", Qty. 2
1/4
) from the bottom of the pedestal top to the peninsula table.
1/4
Drill bit 10mm
Cordless drill/screwdriver
STEP 2: Four (4) predrilled holes in the pedestal top are provided.
Depending on the configuration (as shown in step 3) , two (2)
holes must be drilled all the way through the top of the unit.
OFFSET CONFIGURATION
OFFSET CONFIGURATION
OFFSET CONFIGURATION
Fluid leveler
globalfurnituregroup.com

Advertisement

loading

This manual is also suitable for:

CbyrtxxxxCbyrxx32Cbypxxhb32cbysxxCbypxxlb32CbycxxlbCbycxxhb ... Show all