Masonry; Alternate Masonry - Quadra-Fire MTVERNON-AE-MBK Owner's Manual

Mt. vernon pellet stove advanced energy (ae) installation and operation
Hide thumbs Also See for MTVERNON-AE-MBK:
Table of Contents

Advertisement

R
R R
F. Masonry
G. Alternate Masonry
August 13, 2009
Fire Risk.
Inspection of Chimney:
Masonry chimney must be in good condition.
Meets minimum standard of NFPA 11
Factory-built chimney must be a minimum 6 inch (15mm)
UL10 HT.
Concrete Cap
1 in. (5mm) clearance
with firestop
6 in. (15mm)
minimum
Non-combustible Hearth Pad
Figure 17.1
1 in. (5mm) clearance
with firestop
6 in. (15mm)
minimum
Non-combustible Hearth Pad
Figure 17.2
Mt. Vernon Pellet Stove (AE)
WARNING
Fireclay flue
liner with airspace
Flashing
1 in. (5mm) clearance
 in. (76mm) minimum to
combustible material
Sheathing
Clean-out cover
Concrete Cap
7034-106F
Airtight
Clean-out Door
Fireclay Flue Liner
with airspace
Flashing
1 in. (5mm) clearance
 in. (51mm) minimum to
combustible material
Sheathing
Airtight clean-out door
Page 17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtvernon-ae-pmhMtvernon-ae-csbMtvernon-ae-cwl

Table of Contents