Quadra-Fire SAPPHIRE-D-CSB Owner's Manual page 17

Sapphire gas stove direct vent room heater installation and operation
Hide thumbs Also See for SAPPHIRE-D-CSB:
Table of Contents

Advertisement

Step 8.
Slip the storm collar over the pipe, and push it down to the
top of the flashing Figure 5.16. Use non-hardening sealant
above and below the joint between the storm collar and the
pipe.
Optional High Wind Termination Cap
Secure Flashing with Non-Hardening
Sealant and Roofing Nails
Figure 5.16
Step 9.
Twist-lock the vent cap and seal.
Note: For multi-story vertical installations, a ceiling firestop
is required at the second floor, and any subsequent floors
Figure 5.17. The opening should be framed to 10 in. x 10 in.
(254mm x 254mm) inside dimensions, in the same manner
as shown in Figure 5.14 on page 16.
Ceiling Firestop
Minimum 1 in.
(25mm) Clearance
Minimum 1 in.
(25mm) Clearance
Figure 5.17
Nails
Minimum 1 in.
(25mm) Clearance
Minimum 1 in.
(25mm) Clearance
Quadra-Fire • Sapphire • 7055-116 Rev. D • 6/11
WARNING
Fire Risk.
Explosion Risk.
• Any occupied areas above the first floor, including
closets and storage spaces, which the vertical
vent passed through must be enclosed. The
enclosure may be framed and sheetrocked with
standard construction materials; however, refer
to these installation instructions for the minimum
allowable clearance between the outside of the
vent pipe and the combustible surfaces of the
enclosure. Do not fill any of the required air space
with insulation.
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sapphire-mbkSapphire-d-mbkSapphire-d-pmh

Table of Contents