Quadra-Fire PELLET INSERT CB1200I Owner's Manual page 19

Pellet insert installation and operation
Hide thumbs Also See for PELLET INSERT CB1200I:
Table of Contents

Advertisement

R
R R
Rear Vent Installation Preparation:
1.
Remove the ENTIRE exhaust blower housing by remov-
ing the 4 nuts using a 7/16 inch socket wrench. Set the
nuts aside for later use.
2.
Remove the 4 screws and remove the vertical exhaust
transition pipe exhaust blower housing.
3.
Remove any silicone sealant remaining on the blower
housing.
4.
Attach the rear vent adapter to the exhaust blower hous-
ing with 4 screws. Figure 19.2.
5.
Apply a bead of high temperature silicone adhesive
around the juncture of the blower housing and rear vent
adapter, smoothing it around the joint to ensure that a
good seal is made.
6.
Re-install the exhaust blower housing (now with rear vent
adapter attached) with the 4 nuts previously removed in
Step 1.
7.
Use 2 screws to attach left corner filler piece of rear
shroud to the insert hopper. Figures 18.1 & 18.2 on
page 18.
8.
Install the left shroud corner with 2 screws into the hopper
body and 1 down into filler piece. Figure 19.1.
9.
Install cover plate over top vent opening using 4
screws.
Left Corner
Piece
Figure 19.1
Installing Rear Shroud
Top Vent Applications: Leave knock-out plate in place.
Figure 19.3
Rear Vent Applications: Clip corners of knock-out plate,
remove and discard, prior to assembling rear shroud kit.
1. Install rear panel using 4 screws along bottom and 2 screws
into the left shroud corner piece at the top. Figure 19.3.
2. If your installation does not include an outside air kit,
attach cover plate with 4 screws.
3. Attach left shroud panel using seven screws, 3 on top and
bottom and 1 along the side. Figure 19.3.
February 3, 2010
Figure 19.2
4. Assemble the right corner and right panel pieces using 4
screws prior to attaching to insert. Figure 19.4.
5. After assembly, attach the right shroud panel/corner piece
assembly to the insert with 3 screws across the bottom and
1 on the side. Figure 19.4.
Outside Air
Cover Plate
Figure 19.3
Figure 19.4
Attaching Shroud to Hopper Body:
6. Beginning at the right shroud panel drill into hopper body
through the 3 pre-drilled openings and the 2 pre-drilled
openings on the rear shroud panel. Figure 19.5. Continue
around to left shroud corner panel at the 2 pre-drilled
openings. Figure 19.6. Secure with screws to insert.
7. For Top Vent Installation:
Install 3 inch or 4 inch (76 or 102mm) top vent adapter.
See circled area in Figure 18.3 on page 18.
This adapter may be attached to outside venting prior to
latching it on to the top vent pipe.
Figure 19.5
Figure 19.6
7014-188B
CB1200-I Pellet Insert
Left Side
Right Corner Piece
Attach right
corner piece to
side panel first.
Rear Panel
Right Side
Drill Holes
Drill Holes
Rear Panel
Right Side
Drill Holes
Rear Panel
Left Side
NOTE:
Page 19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cb1200mi-mbk

Table of Contents