NEC Express5800/R310e-E4 User Manual page 55

Express server express5800 series
Hide thumbs Also See for Express5800/R310e-E4:
Table of Contents

Advertisement

Chapter 2 Preparations
2. Installation and Connection
2. Confirm the location of four cage nuts on the front of the kit.
See the figure below for locations of the core nuts (two on the front top and two on the front bottom.)
Note
Four cage nuts have been installed on the chassis of the kit at shipment.
Tower conversion kit (on the front top)
Tower conversion kit (on the front bottom)
3. Remove one screw from the AC lock bracket on the rear of the tower conversion kit.
AC lock bracket
4. Remove the AC lock bracket.
Express5800/R310e-E4, R320e-E4, R320e-M4, R310f-E4, R320f-E4, R320f-M4 User's Guide
55

Advertisement

Table of Contents
loading

Table of Contents