Nibe F1345 Installer Manual page 21

Ground source heat pump
Hide thumbs Also See for F1345:
Table of Contents

Advertisement

Example - F1345 24/30 kW docked with electric additional heat and hot water heater (floating
condensing)
-EB100-BT1
-BP6
-QM21 -FL3
P
-CM3
-EB100
-QM33
-XL28
-XL27
-QM53 -HQ13
-QM34
-QM52
-QM51
-QM50
-EP12
The heat pump (EB100) prioritises charging of hot water
with half the power (cooling module EP14) via a revers-
ing valve (EB100-QN10). When the water heater/accu-
mulator tank (CP10) is fully charged, (EB100-QN10)
switches to the heating circuit. When there is a demand
for heat, cooling module (EP15) starts first. In the event
of greater demand, cooling module (EP14) also starts
for heating operation.
Example 2 - 2x F1345 40/60 kW docked with electric additional heat and hot water heater
(floating condensing)
-EB101
-GP16
-QM53
-EB100-BT1
-RM10
-QM50
-BP6
-QM21
-FL3
P
-CM3
-EB100
-QM33
-GP16
-XL27
-XL28
-QM53
-QM34
-RM10
-QM50
-EP12
NIBE F1345
-EP15
-RM13
-FL11
-FL13
-HQ15 -QM56
-RM11
-EP14
-HQ12
-RM12 -QM55
-RM10 -FL10
-FL12
-HQ14 -QM54
-EB101
-HQ13
-EP15
-RM13
-QM57
-FL13
-HQ15
-QM56
-HQ12
-EP14
-RM12 -QM55
-FL10
-FL12
-HQ14
-QM54
-EB100
-HQ13
-EP15
-RM13
-QM57
-FL13
-HQ15
-QM56
-HQ12
-EP14
-RM12 -QM55
-FL10
-FL12
-HQ14
-QM54
-EB1
-FL10
-EB1
-QM42
-QM43 -RN11
-CP10
-QM57
-BT7
-EB100
-BT6
-EB100-QN10
-FL2
-CM1
Additional heat (EB1) is connected automatically, when
the energy requirement exceeds the heat pump capacity.
Caution
The example on the following page is the out-
line diagram, which is included in the delivery
of the product shown in "Supplied components"
page 10.
-EB1
-FL10
-EB1
-QM42
-RN11
-QM43
-CP10
-BT7
-EB100
-BT6
-EB100-QN10
-FL2
-CM1
-EB100-BT25
-GP10
-RM21 -EB100-BT71
-EB10
-EP21
-AA5
-BT2
-BT3
-QN25
-GP10
-EB100-BT25
-EB100-BT71
-RM21
-QZ1
-QZ-AA5
-RM23
-RN20
-RM24
-EB10
Chapter 4 |
-GP20
POOL1
-GP11
-RN21
-BT70
-FQ1
Pipe connections
21

Advertisement

Table of Contents
loading

Table of Contents