Assembly; Contents Of Shipping Carton; Tools Required For Assembly; Unpacking - Craftsman 768.884900 Owner's Manual

Dual stage track drive snowblower with electric starte
Table of Contents

Advertisement

y^^k
ASSEMBLY
Contents of Shipping Carton
1 25 inch track drivesnow blower completely assembled
except for the crank assembly, speed select lever
assembly and knob and the upper handle which is in the
folded down position.
1 Parts bag containing:
1 Owners manual.
1 3/8 x 1-3/4 inch hex head screw
1 3/8 flat washer
3 3/8 inch hex nuts
1 3/8 inch lockwasher
1 Plastic knob
2 Spare shear bolts
2 Spare shear bolt spacers
2 Spare 1/4 inch locknuts
2 Plastic ties for headlight wire
HOW TO MEASURE SCREW SIZE
(5/16x1-1/2 INCH)
LENGTH
1
Tools Required for Assembly
1 Knife (to cut carton)
2 1/2 inch wrenches (or adjustable wrenches)
2 9/16 inch wrenchs (or adjustable wrenches)
1 Pair pliers or screw driver (to spread cotter pin)
A DANGER A
Always wear safety glasses or eye shields while assem
bling snow blower.
Figure 1 shows the snowblower in the shipping position.
Figure 2 shows the snowblower completely assembled.
Reference to right and left hand side of the snowblower
is from the operators position at the handle.
WING NUTS
FIGURE 1
Unpacking
Cut two rear corners of carton and lay the panel flat.
Cut and discard plastic ties that secure crank assembly.
Cut and discard plastic ties securing cables to lower
handle.
Loosen both wing nuts and swing upper handle into
operating position.
Tighten both wing nuts.
You will now be able to remove snowblower from carton.
Pull snowblower off skid and out of carton by the handle.
AUGER DRIVE CLUTCH
SNOW CHUTE
DEFLECTOR
FIGURE 2
TRACTION DRIVE CLUTCH
SPEED SELECT LEVER
CRANK ASSEMBLY
HEIGHT ADJ SKID

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents