Equipment Shelf Or Tabletop Installation - Cisco ASR 1004 Overview And Installation

Hide thumbs Also See for ASR 1004:
Table of Contents

Advertisement

Equipment Shelf or Tabletop Installation

• The Cisco ASR 1004 Router needs adequate ventilation. Do not install it in an enclosed cabinet where
• Have the cable-management bracket available if you plan to install it on the front of the chassis.
• An adequate chassis ground (earth) connection exists for your router chassis (see the
• Always follow proper lifting practices as outlined in the
Equipment Shelf or Tabletop Installation
At least two people are required to lift the chassis onto a tabletop or platform. To prevent injury, keep
Note
your back straight and lift with your legs, not your back. Statement 164
Figure 5: Lifting the Chassis
Note
The chassis in the image does not represent the Cisco ASR 1004 Router. This is only an example of how
to lift a Cisco chassis.
Cisco ASR 1000 Series Router Hardware Installation Guide
8
ventilation is inadequate.
Ground Connection, on page
handling the chassis.
21).
"Electrical Safety" section on page 5-21
Cisco ASR 1004 Router Overview and Installation
Attaching a Chassis
, when

Advertisement

Table of Contents
loading

Table of Contents