ROUTINE CHECK TESTS
The following check tests have to be carried out on the installed heating system:
Do a Visual inspection to determine if the conditions specified under
Installation Instructions are met.
Conduct an insulation test.
INITIAL OPERATION
When the routine tests are successfully completed, the device can be switched on.
89115889
Spacer
Mounting Surface
Figure 1
© 2016 Pentair Equipment Protection
- 5 -