Hand-Over To The User; Disposal - Daikin FTXP20L2V1B Installer's Reference Manual

Hide thumbs Also See for FTXP20L2V1B:
Table of Contents

Advertisement

For FTXP-L and ATXP-L units
1 Press
,
, and
2 Press
.
3 Select
.
4 Press
.
5 Press
or
to switch the system on.
Result: Test run operation will stop automatically after about
30 minutes.
6 To stop operation, press
For FTXF-A units
7 Press
to switch the system on.
8 Press the centre of
,
9 Press
twice.
Result:
will appear on the display. Test run operation is
selected.
Result: Test run operation will stop automatically after about
30 minutes.
10 To stop operation, press
INFORMATION
Some of the functions CANNOT be used in the test run
operation mode.
If a power failure occurs during operation, the system automatically
restarts immediately after power is restored.
8

Hand-over to the user

Once the test run is finished and the unit operates properly, please
make sure the following is clear for the user:
▪ Make sure that the user has the printed documentation and ask
him/her to keep it for future reference. Inform the user that he can
find the complete documentation on the url as earlier described in
this manual.
▪ Explain the user how to properly operate the system and what to
do in case of problems.
▪ Show the user what to do in relation to maintaining the unit.
9

Disposal

Dismantling of the unit and treatment of the refrigerant, oil and other
parts MUST comply with the applicable legislation.
(A)(F)TXP20~35L2V1B + FTXF20~71A2V1B
Daikin room air conditioner
4P513661-1 – 2017.10
simultaneously.
.
, and
simultaneously.
.
8 Hand-over to the user
Installer reference guide
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents