Download Print this page

Installation & Operation; Unpacking And Control; Charging Before First Use; Placement - Vision BP650 User Manual

Budget pro series

Advertisement

5. INSTALLATION & OPERATION

5.1. Unpacking and control

Remove the packaging from the UPS and inspect it for eventual transport damage. If any damage is discovered, repack the
unit and send it back to the seller.

5.2. Charging before first use

Tis unit was sent ex-factory with its internal battery fully charged; anyhow it can discharge during the transportation. That's
why it has to be charged before first use. Turn on the UPS, plug it into an appropriate power
supply and allow the UPS to charge totally by leaving it plugged in for at least 6 hours with no
load (no electrical devices such as computers, monitors, etc.) connected.

5.3. Placement

Install the UPS unit in a protected environment that provides adequate ventilation around the unit and that's free from
excessive dust, corrosive vapours and conducting polluting substances. Do not operate your UPS in an environment where
the ambient temperature or humidity is high.
Furthermore, maintain a minimum distance of 20 cm between UPS unit and a monitor for avoiding harmful interference.

5.4. Connection

Plug the UPS into a 2-pole grounded mains socket (phase and neutral). Afterwards, connect by means of the delivered cable
one computer or computer-related device to each connection jack on the back side of the UPS.

5.5. Turn On/Off

To turn the UPS on, press the power switch. To turn the UPS off, press the power switch again.

5.6. Cold start in battery mode

All UPS appliances are equipped with a cold start function in battery mode. To start the UPS when mains power is not
available, simply press the power switch.
5
BUDGET PRO series 650-2200VA - UPS
www.visionups.com

Advertisement

loading

This manual is also suitable for:

Bp850Bp1100Bp1300Bp1600Bp650dBp850d ... Show all