Vision Spirit G XL User Manual

Vision Spirit G XL User Manual

1-3 kva –pf0.9

Advertisement

User manual

Spirit G XL
1-3 KVA – PF0.9
Uninterruptible Power Supply

Advertisement

Table of Contents
loading

Summary of Contents for Vision Spirit G XL

  • Page 1: User Manual

    User manual Spirit G XL 1-3 KVA – PF0.9 Uninterruptible Power Supply...
  • Page 2 ● Increase the separation between the equipment and the receiver. ● Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. ● Consult the dealer or an experienced radio/TV technician for help. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 3: Special Symbols

    This symbol indicates that you should not discard waste electrical or electronic equipment (WEEE) in the trash. For proper disposal, contact your local recycling/reuse or hazardous waste center. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 4: Table Of Contents

    Table of Contents Introduction ............................5 Safety Warnings ..........................6 Installation ............................7 Operation ............................18 Communication ..........................36 UPS Maintenance..........................41 Specifications ........................... 44 Troubleshooting ..........................49 SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 5: Introduction

    For RT model, it is equipped with hot swappable battery feature needed for 19”rack solution.  RT models in a space-optimizing 2U size fits any standard 19” rack.  FIG.1 The Rackmount UPS front view FIG.2 The Rackmount EBP front view SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 6: Safety Warnings

    Keep unauthorized personnel away from batteries. Proper disposal of batteries is required. Refer to your local codes for disposal  requirements. Never dispose of batteries in a fire. Batteries may explode when exposed to  flame. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 7: Installation

    Place the cabinet in a protected area that has adequate airflow and is free of humidity, flammable gas, and corrosion. Checking the accessories It includes: UPS user's guide  Software Suite CD  USB cable  Power cord (Input and output)  RS232 cable  SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 8: Rackmount Installation

    If installing optional EBP(S), make sure to install the EBP(S) directly below the  UPS so that all wiring between the cabinets is installed behind the front covers and inaccessible to users. Mounting rails are required for each individual cabinet NOTE SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 9 8. Place the UPS on a flat, stable surface with the front of the cabinet facing to you. 9. Align the mounting brackets with the screw holes on each side of the UPS and fix with the supplied M4×8 flat-head screws(see FIG. 5) SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 10 Do not make unauthorized changes to the ups; otherwise, damage may NOTE occur to your equipment and void your warranty. Do not connect the ups power cord to utility until after installation is NOTE completed. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 11 CAUTION: A small amount of arcing may occur when connecting the internal batteries. This is normal and will not harm personnel. Connect the cables quickly and firmly. FIG.8 Connecting the UPS Internal Batteries SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 12 7. If an emergency power-off (disconnect) switch is required by local codes, see “Remote Emergency Power-off” (REPO) to install the REPO switch before powering on the UPS. 8. Continue to “UPS Initial Startup”. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 13 EBP connector on the second EBP. Repeat for any additional EBPS. Verify that the EBP connections are tight and the adequate bend radius and strain relief exist for each cable. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 14 Return to Step 4 to continue the UPS installation. Rackmount converted to Tower Installation Rackmount converted to Tower plastic base installation ① two plastic base brackets ② flatten it after intercrossing intercross as following FIG. FIG.14 plastic base installation SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 15 ③If an EBP is needed to be placed in the middle, the assembly of plastic base is similar. The difference is that two 1U plastic base extended boards are added in the middle (as the following shows). (A) (B) (C) (D) (E) (F) SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 16 FIG.15 increase EBP plastic base installation 2. The installation between UPS and EBPS can be referred to Fig.16 FIG.16 The installation for UPS and battery box SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 17: Ups Initial Startup

    See Troubleshooting” on page 49. If the indicator is on, do not proceed until all alarms are clear. Check the UPS status from the front cover to view the active alarms. Correct the alarms and restart if necessary. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 18: Operation

    Control Cover Functions The UPS has a three-button segmental LCD with backlight. It provides useful information about the UPS itself, load status, measurements, and settings (see FIG. 18). FIG.18 Control Cover SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 19 Circularly and orderly display the items every 2 seconds, when press and hold the key for some time again, it will turn to output status. Function setting mode: Press and hold the key for more than half a second SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 20 ★ warning seconds bypass mode Main AC low Once voltage every four ★ warning seconds bypass mode Battery disconnect warning Once Affirm Bypass mode ● ★ every four battery switch is SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 21 If display fault code and icon lights, Long contact for Fault mode ● beeps maintenance when you can’t deal with it by yourself. ● _indicator lights for a long time SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 22: Display Functions

    When charger works normally, the corresponding icon will vary Charger-status dynamically and orderly. graphics when charger works abnormally, the section icon will keep flashing When UPS is in battery mode, the number icons SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 23: Parameters Inquiring

    WATT and VA). Display the temperature of the inverter in the UPS. As the following graphics shown: the temperature of Temperature the inverter is 37℃. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 24: User Settings

    ② Enter setting setting(1) interface. Press and hold the function setting key for more than half a second(less than 2 seconds), the letters “ECO” will stop flash. The “ON” (or SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 25 Bypass interface ,short press the scroll function for more than half a setting(2) second (less than 2 seconds) to select BPS setting, the letters “bPS” will flash. ② Enter setting SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 26 ⑥ To set the minus range in the same way. ⑦ After the minus range is confirmed. Long press function setting key for more than 2 seconds to exit setting menu. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 27 ④ Exit from setting interface. Press hold function setting key for more than half a second (less than 2 seconds), exit from the setting interface and return to main interface. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 28 ⑤Exit from the setting interface. Press and hold function setting for more than half a second (less than 2 seconds), exit from the setting interface and return to main interface. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 29 ④ Exit from setting interface. Press hold function setting key for more than half a second (less than 2 seconds), exit from the setting interface and return to main interface. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 30 Converter interface, Press and hold the scroll key for more than half a mode setting second(less than 2 seconds), (7) select function setting, choose output frequency setting interface, the letters SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 31 “RESET” Setting(8) will flash. ② Enter the parameter reset setting interface. Press and hold the function setting key more than half a second(less SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 32 If battery low alarm activates, the indicator of flashes. If battery voltage reaches low limit, UPS will turn off to protect the battery. UPS will auto-restart when the mains recover. NOTE:The backup time of battery SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 33 You can also press the OFF key to shut down the UPS when confirm that there is no serious fault. NOTE: corresponding information of the fault code, please refer to Table 23 Fault Code. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 34 2. When the UPS is in battery mode, press and hold the self-test/mute key for more than 1 second, the buzzer stops beeping. If you press and hold the self-test/mute key for one more second, it will restart to beep again. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 35 ● It is recommended that the generator capacity is as twice as the UPS rated capacity. ● You had better not use the ECO mode when the quality of the input AC mains is not good. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 36: Communication

    The UPS has serial communication capabilities through the USB and RS-232 communication ports or through a connectivity card in the available communication bay. The UPS supports two serial communication devices according to the following table: SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 37 FIG.21 RS-232 Communication Port (DB-9 Connector) Table 9. RS-232 Communication Port Pin Assignment Pin Number Function Definition Direction from the UPS 1、4、6、7、8、9 No use R×D (Transmit to external device) TxD (Receive from external device) GND (Signal common) SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 38: Connectivity Cards

    ● To ensure the UPS stops supplying power to the load during any mode of operation, the input power must be disconnected from the UPS when the emergency power-off function is activated. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 39: Load Segments

    For example, during a power outage, you can keep critical equipment running while you turn off other equipment. This feature allows you to save battery power. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 40 UPS or power information. If there is a power outage and the UPS battery power becomes low, UPSilon2000 software can automatically shut down your computer system to protect your data before the UPS shutdown occurs. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 41: Ups Maintenance

    The EBP can be replaced when UPS is ON, but be aware that if the utility fails at that time, the load of the UPS may NOT be protected. If you prefer to remove input power to change the batteries, see “UPS Turn on and Turn off” on page 33. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 42 FIG.26 Remove the battery park Hold the middle of the new battery pack, insert it. Once install the new battery pack, make sure it is completely inserted into the chassis as fig 27 shown. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 43: Testing New Batteries

    For more information, contact your local recycling/reuse or hazardous waste center CAUTION Do not discard waste electrical or electronic equipment (WEEE) in the trash. For proper disposal, contact your local recycling/reuse or hazardous waste center. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 44: Specifications

    Dimensions (W *D *H) Weight 1KVAS/1KVAH- 15.7 kg/11.5 kg 440*430*86.5mm 1.5KVAS/1.5KVAH - 18.7 kg/11.5 kg 440*430*86.5mm 2KVAS/2KVAH- 26.3 kg /17.5 kg 440*572*86.5mm 3KVAS/3KVAH- 33.0kg /19.8 kg 440*696*86.5mm Model (RT EBP) Dimensions (W *D *H) Weight SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 45 IEC320 C14-10A 1.5KVAS/1.5KVAH IEC320 C13-10A IEC320 C14-10A 2KVAS/2KVAH IEC320 C20-16A IEC320 C19-16A 3KVAS/3KVAH IEC320 C20-16A IEC320 C19-16A Table 17. Electrical Output (All Models) High Voltage Models 200/208/220/230/240V Nominal Outputs (voltage configurable or auto-sensing) SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 46 Power Factor Load Crest Factor 3 to 1 Table 18. Electrical Output Connections (All Models) Model Output Connections Output Cables (IEC C13-10A)*6 IEC320 C14-10A 1.5K- (IEC C13-10A)*6 IEC320 C14-10A (IEC C13-10A)*6 IEC320 C14-10A SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 47 Temperature -25°C to 55°C (-13°F to 131°F) without batteries Transit -25°C to 55°C (-13°F to 131°F) Temperature Relative 0–90% noncondensing Humidity Operating Up to 3,000 meters (9,843 ft) above sea level Altitude SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 48 3K -EBP: 72 Vdc (2 x 6 ,12V, 9 Ah) Fuses (2) 30A/250Vdc fuses (4) 30A/250Vdc fuses per EBP Sealed, maintenance-free, valve-regulated, lead-acid, with minimum 3-year Type float service life at 25°C (77°F) SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 49: Troubleshooting

    If you need help, contact our service department, the following messages should be provided for analysis: ◆UPS MODEL NO. and SERIAL NO. ◆Date of fault happened ◆ Detailed description of the problem (including indicator statements on cover) The following table describes typical alarm conditions. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 50 The icon of charger status on Charger doesn’t LCD display work normally or Contact supplier for servicing flashes and buzzer battery aged beeps once per second The following table describes typical faulty conditions. SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...
  • Page 51 Bus unbalance Soft fail High Soft fail Inv Fault Bus discharge fail Over Heat INV short OverLoad Fan Fault Charger Fault Bat Over InvRelaySht LineNTCBreak Shutdown Fault ▪ ▪ ▪ ▪ ▪ SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com...

Table of Contents