Pipe installation

When doing the piping connection, please do the following:
• Please don't let the pipe and the parts in the unit collide each other.
• When connecting the pipes, close the valves fully.
• Protect the pipe end against and water, impurities (welding after being flatted, or being sealed with adhesive
tape).
• Bend the pipe as large semi-diameter as possible (over 4 times of the pipe diameter).
• The connection between outdoor liquid pipe and the distributing pipe is flared type. Please expand the pipe with
the special tool for R410A after installing the expanding nut. But if the projecting pipe length has been adjusted
with the copper pipe gauge, you can use the original tool to expand the pipe.
• Since the unit is with R410A, the expanding oil is ester oil, not the mineral oil.
• When doing the flare connection, please do the following: When connecting the expanding pipe, fasten the pipes
with double-spanner. The torque refers to the former info.
Expanding pipe: A(mm)
Pipe outer diameter
• The outdoor gas pipe and the refrigerant distributing pipe, as well the refrigerant distributing pipe and the branch
pipe should be welded with hard solder.
• Weld the pipe at the same time charge the nitrogen. Or it will cause a number of impurity (a film of oxidation) to
clog the capillary and the expansion valve, further cause the deadly failure.
• Protect the pipe end against the water, impurity into the pipes (welding after being flat, or being sealed with
adhesive tape).
• The refrigerant pipe should be clean. The nitrogen should flow under the pressure of about 0.2Mpa and when
charging the nitrogen, stop up the end of the pipe by hand to enhance the pressure in the pipe, then loose the
hand (meanwhile stop up the other end).
• When connecting the pipes, close the valves fully.
• When welding the valve and the pipes, use the wet cloth to cool down the valve and the pipes.
A
(mm)
Ø6.35
9.1
Ø9.52
13.2
Ø12.7
16.6
Ø15.88
19.7
Seal the pipe end with adhesive tape or the stopper to
increase the resistance, fill up the pipe with nitrogen.
<N2>
Taping
Only nitrogen gas
can be used
Flat
Brazing
1st side
Source valve
Projecting length of pipe to be expanded: B(mm)
Pipe outer
diameter
(mm)
Ø6.35
Ø9.52
Ø12.7
Ø15.88
Brazing
2nd side
0.2MPa
Hand
25
When it is hard pipe
Special tool
The former
for R410A
tool
0-0.5
1.0-1.5
Adhesive tape