Installation Of Water Drainage Pipe - Haier AB092XCERA Operation And Installation Manual

Haier multi-split series room air conditioner operation & installation manual
Hide thumbs Also See for AB092XCERA:
Table of Contents

Advertisement

Installation Procedures

4. Installation of water drainage pipe

(1) Install water drainage pipe
Pipe diameter shall be equal or larger than that of connecting pipe (Pipe of polythene; size:
25mm; O.D.: 32mm )
Drainpipe should be short, with a downward slope at least 1/100 to prevent air bag from forming.
If downward slope of drainpipe cannot be made,lifting pipe shall be installed.
Keep a distance of 1-1.5m between suspending bolts, to make water hose straight.
Use the drainage hose and clip provided with unit.
Insert water pipe into water plug until it reaches the white tape.
Tighten the clip until head of the screw is less than 4mm from hose.
Wind the ddrainage hose to the clip using seal pad for heat insulation.
Insulate drainage hose in the room.
Tape(white)
5. Cautions for the water drainage lifting pipe
Installation height of water drainage lifting pipe shall be less than 280mm
There should be a right angle with unit ,300mm from unit.
Less than 300mm 1-1.5m
Drainage hose
Clip
< Note >
The slope of water drainage hose shall be within 75mm , make the drainage plug not to bear
excessive force.
If several water hoses join together, of as per following procedures.
Specifications of the selected drainage hoses shall meet the requirements for the unit running
1-1.5m
slope over 1/100
Clip
Draingage hose
Suspending bracket
Less than 280mm
Water drainage
lifting pipe
220mm
Slope less than 1/100
Large size seal pad
(accessory)
Clip
Less than 4mm
Drainage hose
Connection drainage hose with a T-joint
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ab122xceraAb142xceraAb182xcera

Table of Contents