Preparations; Installation Site - STIEBEL ELTRON DEL 18 SL Operation And Installation

Electronically controlled instantaneous water heater
Hide thumbs Also See for DEL 18 SL:
Table of Contents

Advertisement

OPERATION

Preparations

Load shedding relay (LR 1-A)
The load shedding relay for installation in the distribution
board provides priority control for the instantaneous water
heater when other appliances, such as electric storage
heaters, are simultane ously being operated.
ZTA 3/4 - central thermostatic valve
The thermostatic valve is for central premixing, for
example on an instantaneous water heater with solar
thermal system.
Service monitor
Diagnostic unit for detecting faults in the appliance.
9. Preparations
Flush the water line thoroughly.
Taps/valves
Use suitable taps (see chapter " Appliance description/
Accessories"). Open vented taps are not permissible.
A safety valve is not required.
Note
Never use the cross-piece to reduce the flow rate. The
cross-piece should only be used to shut off the appliance.
Permissible water pipe materials
- Cold water inlet pipe:
galvanised steel pipe, stainless steel pipe, copper pipe or
plastic pipe
- DHW outlet pipe:
stainless steel pipe, copper pipe or plastic pipe
Material losses
!
If plastic pipework systems are used, take into account
the maximum inlet temperature and the maximum
permissible pressure (see chapter " Specification / Data
table")
Flow rate
Ensure that the flow rate (see chapter " Specification /
Data table", On) is sufficient for switching on the
appliance.
Increase the mains water pressure if the required flow
rate is not sufficient with an open draw-off valve.
Flexible water connection lines
If the appliance is installed with flexible water
connection lines, ensure that the pipe bends do not
become twisted. Pipe bends have a bayonet fitting
and are installed inside the appliance.
Secure the back panel with an additional screw at the
bottom.
28
| DEL SL electronic LCD
Appliance with adjustable connected load
The appliance DEL 18/21/24 SL electronic LCD is factory
set to 21kW. For other outputs, proceed as follows:
Plug in the coding card according to the selected output;
for selectable output and fuse protection of the appliance,
see "Specification".
Tick the selected output on the type plate. Please use
a ball point pen to do this.

9.1 Installation site

Material losses
!
Only install the appliance in rooms free from the risk of
frost.
Always install the appliance vertically and near the draw-off
point.
The appliance is suitable for undersink and oversink installations.
Note
Mount the appliance on a sufficiently load-bearing wall.
Undersink installation
1 Cold water inlet
2 DHW outlet
Oversink installation
2
1 Cold water inlet
2 DHW outlet
-
1
2
1