6.
Install the component:
a. Firmly seat the FlexibleLOM in the slot.
b. Tighten the thumbscrew.
7.
Install the access panel (Installing the access panel on page 25).
8.
Slide the server into the rack.
9.
Connect the LAN segment cables.
10. Connect each power cord to the server.
11. Connect each power cord to the power source.
12. Power up the server (Powering up the server on page 24).
104
Hardware options installation