Digital China Networks DCRS-7604 Installation Manual page 81

Dcrs-7600 series chassis core routing switch
Table of Contents

Advertisement

DCRS-7600 InstallManual
Step 2: Put the hanger-mounted switch smoothly into a standard 19'' rack.
Because of the size and weight of a DCRS-7600 series, 2 people are
required to complete the installation. With a person standing on each side of
the chassis, grasp the chassis handle in the lower side panel with one hand,
and use the other hand near the top of the chassis for balance. Slowly lift the
chassis in unison and carry it to the rack. Lift the DCRS-7600 series to a
position a little higher than the mounting shelf or sliding rails, resting the
chassis on the shelf/rails, and then carefully slide the chassis into the rack.
Be sure to align the hangers and mounting holes in the rack column.
Step 3: Fasten the DCRS-7600 series to the rack with the screws provided.
Bolt the hangers to the matching holes in the rack column with the screws
provided. Be sure to tighten the screws smoothly. The DCRS-7600 series
should now be securely attached to the equipment rack.
The procedure is shown below:
Fig 2-2 Installing DCRS-7608 Switch Hangers
Chapter 2 Hardware Installation
2-10

Advertisement

Table of Contents
loading

Related Products for Digital China Networks DCRS-7604

This manual is also suitable for:

Dcrs-7608

Table of Contents