Summary of Contents for Beta Motorcycles 400 RR 2008
Page 1
2008‐2009 400/450/525 RR Set Up Instructions 7/2009...
Page 2
1) Remove card board from 4) After removing wood crate, cut off plastic covering support, install handlebars from motorcycle and using bolts supplied. Tighten handlebars. bolts to 18 ft. lbs. 2) Remove additional items 5) Install speedometer using from box supplied. Item list is the two bolts supplied. as follows: ‐Headlight assembly ‐Skid plate ‐Frame guards ‐Tool kit ‐Battery Oring ‐Owners manual ‐Battery ‐Hardware 6) Begin installing the 3) Cut large tie straps on rear headlight assembly by first swing arm and foot rests plugging in the wires.
Page 3
10) Repeat step 8 for the right 7) Complete the headlight side frame guard. installation by inserting the two fingers into the slots cut into the front fender brace. Next connect the two rubber straps around the forks. 11) Install right side panel 8) Install the rubber 6x25mm bolt with frame expanding nut into the left guard attached. Please note side of the swing arm pivot that the spacer goes between bolt. the side panel and the frame guard. 12) Install a zip tie through 9) Install the left side frame the holes in the frame guard guard using the 5x20mm bolt and around the rear brake and two zip ties. pump.
Page 4
You have completed the 13) Install the skid plate set up procedure! bumpers as seen in the picture. 14) Install the two skid plate push‐nuts on the front mounts. Next install the skid plate using the two 6x16 mm bolts in the front and the pan‐ head 6x16 mm screw in the lower rear mount. 15) Insure that the emission hangtag is zip tied to the left handlebar.
Need help?
Do you have a question about the 400 RR 2008 and is the answer not in the manual?
Questions and answers