Huawei EchoLife HS8245W Installation Manual page 8

Hide thumbs Also See for EchoLife HS8245W:
Table of Contents

Advertisement

Unpacking and Accepting Products
Device Inspection
Verify that the device is in good condition, without any damage.
Verify that the device components are complete, without any missing parts.
Cables Inspection
Failure to examine the cables may result in catastrophic equipment damage and service failure.
Verify that the specifications of cable connectors meet the requirements for your site.
Verify that the specifications (including color, core diameter, and length) of cables meet the requirements for
your site.
Accepting the Products
Check the product type and quantity according to the Packing List. Sign documents on site.
Check each product according to the Packing List. If there is a mismatch in the number of packages, or if the
cargo is damaged, or if the consignment is wrong, sign the Unpacking Memo. The project supervisor should also
fill in the Cargo Inspection Feedback Form and report the problem to a local representative office within three
days.
Store the unpacked product safely indoors if the product does not match the contents of the Packing List. Take
photographs of the storage site, the rusty or corroded product, and the device or packaging material. Archive the
photographs and store the empty device and materials.
Confirm the contents of each package one at a time before unpacking the next one.
The project supervisor and the customer sign the Packing List.
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V300r017c10

Table of Contents