Installation Principles - Simrad ME70 Installation Manual

Scientific multibeam echo sounder with bathymetry
Hide thumbs Also See for ME70:
Table of Contents

Advertisement

Simrad ME70 Installation Manual
Note
The quality of the welding is critical to the safety of the vessel. Welding must only be done
by a certified welder.
If applicable, the final installation welds must be approved by the vessel's national registry,
the corresponding maritime authority and/or classification society. Observe the relevant
rules and regulations related to welding.

Installation principles

Basic installation principles apply for the ME70 units. A drop keel is a superior platform for
the ME70 transducer. The other main units are installed in a "sonar room". The Processor
Unit with its display are installed "topside", for example on the bridge, in a laboratory or
in an operator room.
50
345737/C

Advertisement

Table of Contents
loading

Table of Contents