Safety Instructions; General Instructions For Operation Of Light Construction Equipment; Requirements For Qualification Of The Operator; Contractor's Obligations - NTC RZ113 Operation Manual

Asphalt and concrete cutters
Table of Contents

Advertisement

Asphalt and concrete cutters
1.

SAFETY INSTRUCTIONS

1.1. General instructions for operation of light construction equipment

1.1.1. Requirements for qualification of the operator

1. The machine must be operated by
trained reliable operators of age above
18. The operator must read and
understand the safety instructions, the
regulations valid for the respective
jobsite
and
procedure. This should be proved by
getting the operator's signature.

1.1.2. Contractor's obligations

The contractor is understood to be a physical or
legal person that carries out construction works
and
for
such
purpose uses construction
equipment. The contractor is responsible for
operational safety.
The contractor is obliged to:
 designate the operator and arrange his
training
 ensure safe working conditions
 inspect
attendance
regulations

1.1.3. Operator's obligations

The operator is to be designated by the
contractor, while keeping conditions of the
article 1.1.1.
The operator is namely obliged to:
 prior to starting, he should read and
understand
the
including the safety instructions
 attend all instructions of the Operation
Manual
 learn about the jobsite and the locally
valid safety regulations; these must be
kept during the work
 pay full attention to operation of the
machine
page 5
valid
technological
of
the
safety
Operation
Manual
Operation manual
2. The operator is obliged to use suitable
working dress, safety gloves and firm boots
with hard tip. Do not wear loose or torn
clothes, chains or jewelry that could be
caught by moving parts of the machine. The
operator is obliged to use safety goggles and
ear protection.
3. The machine may be used for intended
purpose only, in accordance with this
operation manual.
 inspect that the operator works with the
machine in accordance with the Operation
Manual
 ensure regular inspections, maintenance
and repairs of the machine
 store the Operation Manual so that it is
readily available
 arrange suitable, safe and adequate
storing of the machine when not in use
The contractor is also responsible for proper
attendance of lawful regulations of work safety
and regulations valid for each respective jobsite.
 arrange
that
maintenance and repairs of the machine
are carried our as according to the
Operation Manual
 require
from
conditions for keeping safety instructions,
regular inspections, maintenance and
repairs
 avoid damage, misuse or unauthorized use
to the machine, namely by proper storing
the machine to a secured place
regular
inspections,
the
contractor
proper
issued 01/2017

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rz123

Table of Contents